Wilshaw was engaged by RUC to provide engineering design and drafting services for the shaft sinking works associated with Hong Kong’s Harbour Area Treatment Scheme.

RUC Cementation Mining Contractors

Nov 2009 - Mar 2011

Hong Kong

The Harbour Area Treatment Scheme (HATS) is part of the Hong Kong Government’s infrastructure programme to improve the water quality in Victoria Harbour. RUC Cementation Mining Contractors were awarded the shaft sinking contract for the series of four production shafts and associated infrastructure required for the project. Wilshaw provided the engineering design and drafting services for RUC Cementation Mining Contractors to carry out the shaft sinking operation. The shafts varied from 8.0m diameter to 11.6m diameter and the shaft depths were between 152 to 180m.

Wilshaw’s design work included:

  • Headframe suitable for sinking with a 10 Tonne kibble and then utilising a skip for the tunnelling phase
  • 10 Tonne kibble
  • Emergency Egress ladder way
  • Personnel shaft conveyance
  • Shaft Buntons to support services and crosshead/skip guides
  • 2 Deck Sinking Stage for the various shaft diameters
  • Collar steelwork to support the headframe and stage winders
Steel shaft structure being fabricated in a workshop for the Hong Kong HATS 2A project
Headframe at an urban construction site for the Hong Kong HATS 2A shaft sinking project
Blue shaft skip between vertical guides for Hong Kong HATS 2A
Green steel headframe with a yellow skip and winder at the HATS 2A shaft site
Worker guiding a cylindrical steel shaft section as it is lifted
Shaft platform with ventilation ducts and service pipes for Hong Kong HATS 2A
3D structural model of headframe steelwork and access platforms for Hong Kong HATS 2A
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.