Open Pit Infrastructure

Engineering and project delivery services to a broad range of Australian and international open pit mines.

Wilshaw can assist you with the technical challenges associated with the mining of near surface ore deposits, throughout all stage of the mine lifecycle.

TELFER HEAVY DUTY WORKSHOP RELOCATION

Client
NEWCREST MINING LTD
Duration
FEBRUARY 2003 - JULY 2003
Location
TELFER GOLD MINE

The project involved the relocation of the Heavy Duty Workshop and Tyre Bay in order to accommodate the updated mine plan. As part of the project Wilshaw was contracted to provide the engineering and drafting services to complete the associated works. The scope of work included the following:

  • Civil engineering design and drafting for the relocated Heavy Duty Workshop and Tyre Bay.
  • Specification of the Fuel and Lube Storage Facility.
  • Structural assessment of the raised workshop to accommodate larger haul trucks.
  • Structural engineering design and detailing of the raised workshop.
  • Cost estimation for the relocation and install.
  • Providing an optimisation summary for the Heavy Duty Workshop relocation.
Contact Us