Skip to content

Projects

134 Pump Station Underground

Wilshaw delivered engineering and structural design for the 134 Pump Station at Plutonic Gold Mine, including the dirty water dam, pump plinths, suspended walkway and maintenance monorail.

Plutonic Gold Mine

Wilshaw were engaged to provide the engineering design for the 134 Pump Station at Plutonic Gold Mine. The pump station was fed by a dirty water dam which included primary and secondary concrete dam walls. The dam walls both incorporated cast-in nozzles that were fitted with manual valves for flow control. The dam arrangement also included a suspended walkway between the dam walls. The pump station consisted of two “Weartuff” WT086 pumps. Wilshaw completed the structural design for the dam walls, pump plinths, suspended walkway and overhead monorail for pump maintenance.

Pumps and pipework in a lit underground pump station chamber
Concrete chambers and pump foundations at the underground 134 pump station
3D model of an underground pump station sump with an access ladder
3D model of an underground pump station with two pumps beside a sump
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.