Appin Mine Shaft Sinking

We supported the successful assembly and installation of the 70t sinking stage, manufactured and mobilised two RUCshaw 5/12 winders and completed the 50-metre pre-sink following first blast.

Redpath Mining

Appin Mine

Once again working collaboratively with our business partner, Redpath Mining and its team at Appin Mine Shaft Operations, we have helped them achieve some significant project milestones:

  • The sinking stage was expertly assembled and safely chaired in the shaft, with the lift weighing in at just under 70 tonnes (including proof load) – achieved with precise planning and preparation!
  • In collaboration with Eilbeck Heavy Machining, we manufactured and mobilised two Rucshaw 5/12 winders
  • A flawless first blast means the pre-sink is now complete down to a depth of 50 metres

For more info about the project, visit: https://lnkd.in/gm-DsHnk.

Thanks as always to our partners at RUC Mining and Eilbeck Heavy Machining – always great working with you.

Project update: Wilshaw helps RUC Mining achieve significant milestones at Appin mine shaft operations
Project update: Wilshaw helps RUC Mining achieve significant milestones at Appin mine shaft operations
Project update: Wilshaw helps RUC Mining achieve significant milestones at Appin mine shaft operations
Project update: Wilshaw helps RUC Mining achieve significant milestones at Appin mine shaft operations
Project update: Wilshaw helps RUC Mining achieve significant milestones at Appin mine shaft operations
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.