K2 Shaft Ventilation System Installation

Wilshaw was responsible for the engineering design to permit the re-use of the existing K1 Vent Fan at the K2 location.

Pt Nusa Halmahera Minerals (Newcrest Mining Limited JV)

Jan 2010 - Mar 2010

Head Office PT. NHM Gosowong Gold Mine Site

The project consisted of PT NHM installing a new ventilation system as part of the extension to the K2 Shaft. It was proposed that the existing K1 Shaft fan installation was to be relocated to the K2 Shaft. This installation consisted of two fans, each driven by new 400kW Teco 690V motors, associated power, control and monitoring equipment. Wilshaw was responsible for the engineering design to permit the re-use of the existing K1 Vent Fan at the K2 location. The scope of work for Wilshaw included the following:

  • Detailed engineering design and drafting of the Fresh Air Rise plenum
  • Detailed engineering design and drafting of the fan support structure combining air foil technology
  • Civil design for the Vent Fan footings
  • Work methodology and procedure
Surface ventilation fan ducts beside a retaining wall for the K2 shaft ventilation project
Close-up of ventilation fan blades and motor for the K2 shaft ventilation system
Twin vertical ventilation fan units with workers at their base for the K2 shaft ventilation project
Horizontal ventilation fan assembly on a steel base for the K2 shaft ventilation project
Ventilation duct beneath steel access platforms and stairs at K2 shaft
Large surface ventilation fan and duct on concrete supports at K2 shaft
Overhead view of twin ventilation fan assemblies and ducts at K2 shaft