Skip to content

Projects

Red October Ventilation Shaft

Wilshaw was engaged to design, certify and fabricate the steel can liners for Saracen Gold Mines’ primary ventilation shaft, as well as provide engineering support and assist with the installation methodology.

Saracen Gold Mines

Dec 2012 - May 2013

Red October Gold Mine

Wilshaw were contacted by Saracen Gold Mines management seeking assistance with the mining method for their primary return air rise. Following Saracens decision to stop conventional shaft sinking methods Saracen were left with no primary ventilation system and an underground gold mine in full production. Wilshaw suggested raise boring the vent shaft and lining the entire shaft with steel can liners.

The construction of the vent shaft involved raiseboring the shaft to 4.5m in diameter and then lowering the steel can liner supports (35m in total length) down into the underground workings and pouring grout behind the cans to cast them into place.

Wilshaw were employed to provide the engineering designs, certification and fabrication of the cans and assist in the installation methodology.

Curved steel lining sections laid out for the Red October ventilation shaft
Crane lowering a cylindrical steel liner into the Red October ventilation shaft
Raisebore rig set up on a reinforced pad at the Red October ventilation shaft
Crane installing a ventilation shaft liner in the floor of an open pit
Telehandler lifting a curved steel lining panel for the Red October ventilation shaft
View up the lined Red October ventilation shaft from underground
Curved steel shaft lining panels secured on a flatbed trailer for the Red October project
Yellow shaft collar with a sign reading 'Red October Mine - 1300 RAR'
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.