Wilshaw delivered integrated engineering solutions covering the pumping system, electrical and mechanical infrastructure, piping, structural elements and civil works at the Chirano Gold Mine Underground 1850 Pump Station.

Chirano Gold Mine Ltd

Chirano Gold Mine, Ghana

The Underground 1850 Pump Station at the Chirano Gold Mine consisted of five “WearTuff” WT106 progressive cavity pumps with two staging tanks complete with run down screens. Wilshaw was contracted to provide the engineering design of the pumping system which was inclusive of all the electrical, mechanical, piping and structural requirements associated with a pump station. In addition, Wilshaw provided the civil design for the pump bases at the underground pumping facility.

3D model of tanks and an elevated access platform for the underground 1850 pump station
3D model of the underground 1850 pump station with parallel pump skids, tanks and access platforms
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.