Underground Pump Station MMHY 1980

Wilshaw provided multidisciplinary engineering and civil design for the Hammerhead 1980 RL underground pumping facility expansion, comprising three new pump stations and associated infrastructure.

Anglogold Ashanti

Sunrise Dam Gold Mine

The project was the expansion of the existing underground pumping facility at the Hammerhead 1980 RL. The extension of the system comprised of three pump stations containing three “WearTuff” WT106 progressive cavity pumps. Wilshaw was contracted to provide the engineering design of the pumping system which was inclusive of all the electrical, mechanical and structural requirements associated with a surface pumping system. In addition, Wilshaw provided the civil design for the pump bases at the underground pumping facility.

 

Engineering drawing with plan and 3D views of underground pump station MMHY 1980
Back to all Projects
Share this Project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.