Engineered solutions to improve the processing plant’s operating efficiency and productivity.
Our expertise covers all stages of the project, from early conceptual and prefeasibility studies through to commissioning and ongoing operation of the facility.
The project involved the upgrade of the existing sampling system with a new system which could be shut down for regular routine maintenance without blockage of the pipes. The scope of work for the project consisted of modelling a new system which was based on the existing courier sampling system. Wilshaw was contracted by BHP Billiton – Nickel West to conduct the following: