Wilshaw designed & supplied structural equipment for HV cable installation & permanent support in mine ventilation shaft

Beta Hunt Operations Cable Installation and Shaft Support

Wilshaw designed and supplied all structural equipment for the 608m HV cable installation and permanent support in MIE’s ventilation shaft at Beta Hunt Operations.

View project
3D model of an underground pump station with two pumps beside a sump

134 Pump Station Underground

Wilshaw delivered engineering and structural design for the 134 Pump Station at Plutonic Gold Mine, including the dirty water dam, pump plinths, suspended walkway and maintenance monorail.

View project
Drill rig working in an underground drive with an operator alongside

Underground Pump Station MMHY 1980

Wilshaw provided multidisciplinary engineering and civil design for the Hammerhead 1980 RL underground pumping facility expansion, comprising three new pump stations and associated infrastructure.

View project
Steel screen panels in the sump at pump station AW10

Pump Station AW10

Wilshaw delivered the engineering design and drafting for the AW10 Pump Station, including the staging tank hopper, pipework, monorails and supporting civil works.

View project
3D model of the underground 1850 pump station with parallel pump skids, tanks and access platforms

Underground 1850 Pump Station

Wilshaw delivered integrated engineering solutions covering the pumping system, electrical and mechanical infrastructure, piping, structural elements and civil works at the Chirano Gold Mine Underground 1850 Pump Station.

View project
Heavy-duty workshop with haul trucks in its bays at Telfer

Telfer Heavy Duty Workshop Relocation

Wilshaw was engaged to provide engineering and drafting services for the relocation and optimisation of the Heavy Duty Workshop and Tyre Bay, including civil, structural and cost estimation works.

View project
Wash pad with access stairs and bollards at Sunrise Dam Gold Mine

Sunrise Dam Gold Mine Wash Pad

Wilshaw was engaged by Roche Mining to provide civil and structural engineering design for the wash pad and associated infrastructure at Sunrise Dam Gold Mine.

View project