Skip to content

Wilshaw

Projects

Yellow cylindrical mesh shaft cage in a workshop for the Grasberg service shaft

Grasberg Service Shaft

Wilshaw was engaged by RUC Cementation to provide engineering design and drafting services for the Grasberg Service Shaft project.

View project
Steel headframe with access platforms and yellow guardrails at the Gosowong K2 shaft extension

Gosowong Extension K2 Shaft

Wilshaw was engaged by Byrnecut Indonesia to provide project management, engineering and drafting services for the K2 Shaft Sink.

View project
Crane installing a ventilation shaft liner in the floor of an open pit

Red October Ventilation Shaft

Wilshaw was engaged to design, certify and fabricate the steel can liners for Saracen Gold Mines’ primary ventilation shaft, as well as provide engineering support and assist with the installation methodology.

View project
Close-up of ventilation fan blades and motor for the K2 shaft ventilation system

K2 Shaft Ventilation System Installation

Wilshaw was responsible for the engineering design to permit the re-use of the existing K1 Vent Fan at the K2 location.

View project

Ready to start your next project?

Speak with our team about your underground mine infrastructure needs.

Copyright Wilshaw 2026. All rights reserved.